Level 2SWTCH24-hour access

200 E Eckerson Rd Building

200 E Eckerson Rd #260, New City, NY 10956, USA

6.7 kW charging across 6 charging stalls, operated by SWTCH. $0.39 per kWh listed.

EV charging at 200 E Eckerson Rd Building
6.7 kW6 charging stalls
SWTCH

Charging location

New City, New York

J1772

The record

The station at a glance

200 E Eckerson Rd Building is listed as level 2 charging in New City, New York, operated by SWTCH. It records 6 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.7 kW
Stalls
6
Connectors
1
Listed price
$0.39

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Finkelstein MemorialLevel 2

Finkelstein Memorial

11.5 kW8 stalls

Spring Valley, New York· 1.6 mi

J1772
$0.20 /kWhWevo Energy
Level 2

Clarkstown Town Hall

6.5 kW7 stalls

New City, New York· 2.4 mi

J1772
Price not listedChargePoint

Sonesta Simply Suites Nanuet is 1.3 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 21 min10% to 80%

Audi A6 e-tron takes about 6.656 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.656 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at 200 E Eckerson Rd Building

Where is 200 E Eckerson Rd Building?

200 E Eckerson Rd Building is at 200 E Eckerson Rd #260, New City, NY 10956, USA.

How fast can I charge at 200 E Eckerson Rd Building?

200 E Eckerson Rd Building lists a peak of 6.7 kW (Level 2) and J1772 connectors.

How much does charging cost at 200 E Eckerson Rd Building?

200 E Eckerson Rd Building quotes $0.39 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does 200 E Eckerson Rd Building have?

200 E Eckerson Rd Building lists 6 charging stalls. It is listed as open around the clock. Live availability is not tracked.