Level 2FLO24-hour access

Abbot Kinney Parking

1348 Abbot Kinney Blvd, Venice, CA 90291, USA

6 kW charging across 1 charging stalls, operated by FLO. A per-kWh price is not listed.

EV charging at Abbot Kinney Parking
6 kW1 charging stalls
FLO

Charging location

Los Angeles, California

J1772

The record

The station at a glance

Abbot Kinney Parking is listed as level 2 charging in Los Angeles, California, operated by FLO. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6 kW
Stalls
1
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingStreet Parking

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Los Amigos ParkLevel 2

Los Amigos Park

6.5 kW1 stall

Santa Monica, California· 1.4 mi

J1772
$0.40 /kWhChargePoint
Level 2

Joslyn Park

6.5 kW2 stalls

Santa Monica, California· 1.5 mi

J1772
$0.40 /kWhChargePoint
EV charger at Watt CompaniesLevel 2

Watt Companies

7.2 kW1 stall

Santa Monica, California· 2.0 mi

J1772
Price not listedIndependent

Los Amigos Park is 1.4 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

10 hr 23 min10% to 80%

Audi A6 e-tron takes about 6 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Abbot Kinney Parking

Where is Abbot Kinney Parking?

Abbot Kinney Parking is at 1348 Abbot Kinney Blvd, Venice, CA 90291, USA.

How fast can I charge at Abbot Kinney Parking?

Abbot Kinney Parking lists a peak of 6 kW (Level 2) and J1772 connectors.

How much does charging cost at Abbot Kinney Parking?

A per-kWh price is not listed for Abbot Kinney Parking. Some networks bill per minute or per session instead.

How many charging stalls does Abbot Kinney Parking have?

Abbot Kinney Parking lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.