DC fastChargePoint24-hour access

Ann Arbor City Hall

100 N 5th Ave, Ann Arbor, MI 48104, USA

62.5 kW charging across 4 charging stalls, operated by ChargePoint. $0.40 per kWh listed.

EV charging at Ann Arbor City Hall
62.5 kW4 charging stalls
ChargePoint

Charging location

Ann Arbor, Michigan

CCS1CHAdeMO

The record

The station at a glance

Ann Arbor City Hall is listed as dc fast charging in Ann Arbor, Michigan, operated by ChargePoint. It records 4 charging stalls and CCS1, CHAdeMO connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
62.5 kW
Stalls
4
Connectors
2
Listed price
$0.40

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingGovernment

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Fuller ParkLevel 2

Fuller Park

6.5 kW3 stalls

Ann Arbor, Michigan· <1 mi

J1772
$0.20 /kWhChargePoint
Charging

Mitchell Field

Power not listed1 stall

Ann Arbor, Michigan· 1.2 mi

J1772
$0.19 /kWhChargePoint
EV charger at Kroger Ann ArborCharging

Kroger Ann Arbor

Power not listed1 stall

Ann Arbor, Michigan· 1.9 mi

J1772
$0.32 /kWhJOLT

Liberty Square Parking Structure is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

62.5 kW peak here

51 min10% to 80%

The car asks for 63 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 63 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 28% — about 109 miles of range. Filling right to 100% instead takes 1 hr 13 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Ann Arbor City Hall

Where is Ann Arbor City Hall?

Ann Arbor City Hall is at 100 N 5th Ave, Ann Arbor, MI 48104, USA.

How fast can I charge at Ann Arbor City Hall?

Ann Arbor City Hall lists a peak of 62.5 kW (DC fast) and CCS1, CHAdeMO connectors.

How much does charging cost at Ann Arbor City Hall?

Ann Arbor City Hall quotes $0.40 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Ann Arbor City Hall have?

Ann Arbor City Hall lists 4 charging stalls. It is listed as open around the clock. Live availability is not tracked.