Level 2HOSPITAL AGCH STATION 1
Arroyo Grande, California· <1 mi
365 S Halcyon Rd, Arroyo Grande, CA 93420, USA
6.5 kW charging across 2 charging stalls, operated by ChargePoint. $0.39 per kWh listed.
Charging location
Arroyo Grande, California
The record
Arroyo Grande Hospital is listed as level 2 charging in Arroyo Grande, California, operated by ChargePoint. It records 2 charging stalls and J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
Connectors
Power is the station’s peak, not a per-connector rating.
Access and setting
These details come from the station listing, not a live check.
Nearby
HOSPITAL AGCH STATION 1 is <1 mi away.
Keep looking
Compatible vehicles
Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
Level 2 · AC only
Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.
Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.
Common questions
Arroyo Grande Hospital is at 365 S Halcyon Rd, Arroyo Grande, CA 93420, USA.
Arroyo Grande Hospital lists a peak of 6.5 kW (Level 2) and J1772 connectors.
Arroyo Grande Hospital quotes $0.39 per kWh. Networks set their own tariffs, and some add a session or connection fee.
Arroyo Grande Hospital lists 2 charging stalls. Live availability is not tracked.