Level 2ChargePoint24-hour access

Austin Community College

ACC Cypress Creek, Cedar Park, TX 78613, USA

6.5 kW charging across 2 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

EV charging at Austin Community College
6.5 kW2 charging stalls
ChargePoint

Charging location

Cedar Park, Texas

J1772

The record

The station at a glance

Austin Community College is listed as level 2 charging in Cedar Park, Texas, operated by ChargePoint. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
2
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessPay parkingSchool/University

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Cedar Park NissanDC fast

Cedar Park Nissan

50 kW2 stalls

Cedar Park, Texas· 1.7 mi

CCS1CHAdeMO+1
Price not listedInCharge
EV charger at CalizaLevel 2

Caliza

6.5 kW2 stalls

Cedar Park, Texas· 1.8 mi

J1772
Price not listedChargePoint

City Cedar Park CP City Hall is 1.4 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Austin Community College

Where is Austin Community College?

Austin Community College is at ACC Cypress Creek, Cedar Park, TX 78613, USA.

How fast can I charge at Austin Community College?

Austin Community College lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Austin Community College?

A per-kWh price is not listed for Austin Community College. Some networks bill per minute or per session instead.

How many charging stalls does Austin Community College have?

Austin Community College lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.