DC fastEV Connect24-hour access

Bayer Chevrolet Breckenridge

601 W Walker St, Breckenridge, TX 76424, USA

50 kW charging across 6 charging stalls, operated by EV Connect. $0.50 per kWh listed.

EV charging at Bayer Chevrolet Breckenridge
50 kW6 charging stalls
EV Connect

Charging location

Breckenridge, Texas

CCS1J1772

The record

The station at a glance

Bayer Chevrolet Breckenridge is listed as dc fast charging in Breckenridge, Texas, operated by EV Connect. It records 6 charging stalls and CCS1, J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
50 kW
Stalls
6
Connectors
2
Listed price
$0.50

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingDealership

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Coffee Creek RV ParkCharging

Coffee Creek RV Park

Power not listed1 outlet

Santo, Texas· 48 mi

NEMA 14-50
Price not listedIndependent
Charging

Fort Richardson State Park

Power not listed82 outlets

Jacksboro, Texas· 53 mi

NEMA 14-50Wall outlet
Price not listedIndependent
Charging

Wes-T-Go Truck Stop

Power not listed1 outlet

Tye, Texas· 59 mi

NEMA 14-50Wall outlet
Price not listedIndependent

Fort Griffin State Park is 21 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

50 kW peak here

1 hr 4 min10% to 80%

The car asks for 50 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 50 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 22% — about 87 miles of range. Filling right to 100% instead takes 1 hr 27 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Bayer Chevrolet Breckenridge

Where is Bayer Chevrolet Breckenridge?

Bayer Chevrolet Breckenridge is at 601 W Walker St, Breckenridge, TX 76424, USA.

How fast can I charge at Bayer Chevrolet Breckenridge?

Bayer Chevrolet Breckenridge lists a peak of 50 kW (DC fast) and CCS1, J1772 connectors.

How much does charging cost at Bayer Chevrolet Breckenridge?

Bayer Chevrolet Breckenridge quotes $0.50 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Bayer Chevrolet Breckenridge have?

Bayer Chevrolet Breckenridge lists 6 charging stalls. It is listed as open around the clock. Live availability is not tracked.