Level 2Bensonhurst Municipal Field
1763 86th St, Brooklyn, NY 11214, USA
50 kW charging across 8 charging stalls, operated by EV Connect. $0.27 per kWh listed.
Charging location
New York, New York
The record
The station at a glance
Bensonhurst Municipal Field is listed as dc fast charging in New York, New York, operated by EV Connect. It records 8 charging stalls and CCS1, CHAdeMO, J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
- Peak power
- 50 kW
- Stalls
- 8
- Connectors
- 3
- Listed price
- $0.27
Connectors
Plug options
CCS1
Listed at this station · what it fits
CHAdeMO
Listed at this station · what it fits
J1772
Listed at this station · what it fits
Power is the station’s peak, not a per-connector rating.
Access and setting
What surrounds the charger
These details come from the station listing, not a live check.
Nearby
Other charging stops
Bay Ridge Municipal Parking Garage is 1.5 mi away.
Keep looking
This stop in context
Compatible vehicles
Cars that can charge here
Exact connector matches for CCS1, CHAdeMO, J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
How long would your car sit here?
50 kW peak here
The car asks for 50 kW here to begin with, then tapers to about 34 kW as the pack fills.
A 20-minute stop adds 22% — about 87 miles of range. Filling right to 100% instead takes 1 hr 27 min.
Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.
Common questions
Charging at Bensonhurst Municipal Field
Where is Bensonhurst Municipal Field?
Bensonhurst Municipal Field is at 1763 86th St, Brooklyn, NY 11214, USA.
How fast can I charge at Bensonhurst Municipal Field?
Bensonhurst Municipal Field lists a peak of 50 kW (DC fast) and CCS1, CHAdeMO, J1772 connectors.
How much does charging cost at Bensonhurst Municipal Field?
Bensonhurst Municipal Field quotes $0.27 per kWh. Networks set their own tariffs, and some add a session or connection fee.
How many charging stalls does Bensonhurst Municipal Field have?
Bensonhurst Municipal Field lists 8 charging stalls. It is listed as open around the clock. Live availability is not tracked.





