DC fastEV Connect

Bert Ogden Buick GMC

4221 S Business Hwy 281, Edinburg, TX 78539, USA

50.6 kW charging across 2 charging stalls, operated by EV Connect. $0.60 per kWh listed.

EV charging at Bert Ogden Buick GMC
50.6 kW2 charging stalls
EV Connect

Charging location

Edinburg, Texas

CCS1J1772

The record

The station at a glance

Bert Ogden Buick GMC is listed as dc fast charging in Edinburg, Texas, operated by EV Connect. It records 2 charging stalls and CCS1, J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
50.6 kW
Stalls
2
Connectors
2
Listed price
$0.60

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicMon-Sat: 7:30 AM - 8:00 PMFree parkingDealership

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Fiesta ChevroletDC fast

Fiesta Chevrolet

50 kW1 stall

Edinburg, Texas· <1 mi

CCS1
$0.60 /kWhIndependent
EV charger at BMW of PharrCharging

BMW of Pharr

Power not listed3 stalls

Pharr, Texas· 1.3 mi

CCS1J1772
$0.60 /kWhInCharge
Charging

520 Jackson Avenue W

Power not listed1 stall

Donna, Texas· 6.1 mi

J1772
$0.30 /kWhEpic Charging

Fiesta Chevrolet is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

50.6 kW peak here

1 hr 3 min10% to 80%

The car asks for 51 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 51 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 23% — about 89 miles of range. Filling right to 100% instead takes 1 hr 26 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Bert Ogden Buick GMC

Where is Bert Ogden Buick GMC?

Bert Ogden Buick GMC is at 4221 S Business Hwy 281, Edinburg, TX 78539, USA.

How fast can I charge at Bert Ogden Buick GMC?

Bert Ogden Buick GMC lists a peak of 50.6 kW (DC fast) and CCS1, J1772 connectors.

How much does charging cost at Bert Ogden Buick GMC?

Bert Ogden Buick GMC quotes $0.60 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Bert Ogden Buick GMC have?

Bert Ogden Buick GMC lists 2 charging stalls. Its listed hours are Mon-Sat: 7:30 AM - 8:00 PM. Live availability is not tracked.