Carefree RV Park
Harlingen, Texas· 4.8 mi
8721 W Expy 83, Harlingen, TX 78552, USA
6.5 kW charging across 1 charging stalls, operated by ChargePoint. A per-kWh price is not listed.
Charging location
Harlingen, Texas
The record
Bert Ogden Toyota is listed as level 2 charging in Harlingen, Texas, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
Connectors
Power is the station’s peak, not a per-connector rating.
Access and setting
These details come from the station listing, not a live check.
Nearby
Carefree RV Park is 4.8 mi away.
Keep looking
Compatible vehicles
Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
Level 2 · AC only
Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.
Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.
Common questions
Bert Ogden Toyota is at 8721 W Expy 83, Harlingen, TX 78552, USA.
Bert Ogden Toyota lists a peak of 6.5 kW (Level 2) and J1772 connectors.
A per-kWh price is not listed for Bert Ogden Toyota. Some networks bill per minute or per session instead.
Bert Ogden Toyota lists 1 charging stalls. Its listed hours are Business hours. Live availability is not tracked.