Level 2ChargeSmart EV24-hour access

BP3 Springside Development

44 Springside Ave, Poughkeepsie, NY 12603, USA

9.8 kW charging across 3 charging stalls, operated by ChargeSmart EV. $0.49 per kWh listed.

EV charging at BP3 Springside Development
9.8 kW3 charging stalls
ChargeSmart EV

Charging location

Poughkeepsie, New York

J1772

The record

The station at a glance

BP3 Springside Development is listed as level 2 charging in Poughkeepsie, New York, operated by ChargeSmart EV. It records 3 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
9.8 kW
Stalls
3
Connectors
1
Listed price
$0.49

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at 825 Main StDC fast

825 Main St

120 kW2 stalls

Arlington, New York· <1 mi

CCS1
$0.50 /kWhRed E
EV charger at The HeartwoodLevel 2

The Heartwood

11.5 kW4 stalls

Irvington, New York· <1 mi

J1772
$0.28 /kWhChargePoint

825 Main St is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

6 hr 22 min10% to 80%

Audi A6 e-tron takes about 9.776 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 9.776 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at BP3 Springside Development

Where is BP3 Springside Development?

BP3 Springside Development is at 44 Springside Ave, Poughkeepsie, NY 12603, USA.

How fast can I charge at BP3 Springside Development?

BP3 Springside Development lists a peak of 9.8 kW (Level 2) and J1772 connectors.

How much does charging cost at BP3 Springside Development?

BP3 Springside Development quotes $0.49 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does BP3 Springside Development have?

BP3 Springside Development lists 3 charging stalls. It is listed as open around the clock. Live availability is not tracked.