Level 2ChargePoint24-hour access

Buckingham Township, Municipal Building

4613 Durham Rd, Doylestown, PA 18902, USA

6.5 kW charging across 1 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

EV charging at Buckingham Township, Municipal Building
6.5 kW1 charging stalls
ChargePoint

Charging location

Doylestown, Pennsylvania

J1772

The record

The station at a glance

Buckingham Township, Municipal Building is listed as level 2 charging in Doylestown, Pennsylvania, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
1
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingGovernment

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Fred Beans VolkswagenDC fast

Fred Beans Volkswagen

62.5 kW3 stalls

Doylestown, Pennsylvania· 3.8 mi

CCS1NACS
$0.45 /kWhChargePoint
EV charger at GIANT 2nd St PikeLevel 2

GIANT 2nd St Pike

9.6 kW2 stalls

Richboro, Pennsylvania· 7.8 mi

J1772
$0.32 /kWhJOLT

Fred Beans Volkswagen is 3.8 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Buckingham Township, Municipal Building

Where is Buckingham Township, Municipal Building?

Buckingham Township, Municipal Building is at 4613 Durham Rd, Doylestown, PA 18902, USA.

How fast can I charge at Buckingham Township, Municipal Building?

Buckingham Township, Municipal Building lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Buckingham Township, Municipal Building?

A per-kWh price is not listed for Buckingham Township, Municipal Building. Some networks bill per minute or per session instead.

How many charging stalls does Buckingham Township, Municipal Building have?

Buckingham Township, Municipal Building lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.