Level 2Burbank City Hall
321-371 E Olive Ave, Burbank, CA 91502, USA
Power not listed charging across 1 charging stalls. $0.21 per kWh listed.
Charging location
Burbank, California
The record
The station at a glance
Burbank City Hall is listed as a charging stop in Burbank, California. It records 1 charging stalls and J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
- Peak power
- Power not listed
- Stalls
- 1
- Connectors
- 1
- Listed price
- $0.21
Connectors
Plug options
Power is the station’s peak, not a per-connector rating.
Access and setting
What surrounds the charger
These details come from the station listing, not a live check.
Nearby
Other charging stops
Burbank Public Parking is <1 mi away.
Keep looking
This stop in context
Compatible vehicles
Cars that can charge here
Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
How long would your car sit here?
Level 2 · AC only
Audi A6 e-tron takes about 11 kW on AC, so a full pack is a different kind of wait.
Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.
Common questions
Charging at Burbank City Hall
Where is Burbank City Hall?
Burbank City Hall is at 321-371 E Olive Ave, Burbank, CA 91502, USA.
How fast can I charge at Burbank City Hall?
The record does not list a peak charging power for this station. It lists J1772 connectors.
How much does charging cost at Burbank City Hall?
Burbank City Hall quotes $0.21 per kWh. Networks set their own tariffs, and some add a session or connection fee.
How many charging stalls does Burbank City Hall have?
Burbank City Hall lists 1 charging stalls. Its listed hours are 24/7. Live availability is not tracked.



