DC fastChargePoint24-hour access

City Hall of Atlantic City

1301 Bacharach Blvd, Atlantic City, NJ 08401, USA

130 kW charging across 5 charging stalls, operated by ChargePoint. $0.40 per kWh listed.

EV charging at City Hall of Atlantic City
130 kW5 charging stalls
ChargePoint

Charging location

Atlantic City, New Jersey

CCS1CHAdeMOJ1772

The record

The station at a glance

City Hall of Atlantic City is listed as dc fast charging in Atlantic City, New Jersey, operated by ChargePoint. It records 5 charging stalls and CCS1, CHAdeMO, J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
130 kW
Stalls
5
Connectors
3
Listed price
$0.40

Connectors

Plug options

3 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingGovernment

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Sheraton HotelCharging

Sheraton Hotel

Power not listed1 outlet

Atlantic City, New Jersey· <1 mi

Wall outlet
Price not listedIndependent
EV charger at Arts/Wave GarageLevel 2

Arts/Wave Garage

6.5 kW6 stalls

Atlantic City, New Jersey· <1 mi

J1772
Price not listedChargePoint

Resorts Casino Hotel - Surface Lot is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO, J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

125 kW peak here

28 min10% to 80%

The car asks for 125 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 125 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 55% — about 217 miles of range. Filling right to 100% instead takes 50 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at City Hall of Atlantic City

Where is City Hall of Atlantic City?

City Hall of Atlantic City is at 1301 Bacharach Blvd, Atlantic City, NJ 08401, USA.

How fast can I charge at City Hall of Atlantic City?

City Hall of Atlantic City lists a peak of 130 kW (DC fast) and CCS1, CHAdeMO, J1772 connectors.

How much does charging cost at City Hall of Atlantic City?

City Hall of Atlantic City quotes $0.40 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does City Hall of Atlantic City have?

City Hall of Atlantic City lists 5 charging stalls. It is listed as open around the clock. Live availability is not tracked.