DC fastFrancis Energy24-hour access

Comfort Inn & Suites Sheboygan I-43

3912 Motel Rd, Sheboygan, WI 53081, USA

200 kW charging across 2 charging stalls, operated by Francis Energy. $0.54 per kWh listed.

EV charging at Comfort Inn & Suites Sheboygan I-43
200 kW2 charging stalls
Francis Energy

Charging location

Sheboygan, Wisconsin

CCS1

The record

The station at a glance

Comfort Inn & Suites Sheboygan I-43 is listed as dc fast charging in Sheboygan, Wisconsin, operated by Francis Energy. It records 2 charging stalls and CCS1 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
200 kW
Stalls
2
Connectors
1
Listed price
$0.54

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingLodging

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Holiday Inn ExpressLevel 2

Holiday Inn Express

16 kW3 stalls

Sheboygan, Wisconsin· 2.7 mi

J1772NACS
Price not listedTesla Destination
EV charger at Sheboygan CadillacDC fast

Sheboygan Cadillac

50 kW2 stalls

Sheboygan, Wisconsin· 3.2 mi

CCS1
$0.50 /kWhEV Connect
EV charger at Marsh CampgroundLevel 2

Marsh Campground

6.5 kW1 stall

Russell, Wisconsin· 19 mi

J1772
Price not listedChargePoint

Holiday Inn Express is 2.7 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

200 kW peak here

22 min10% to 80%

The car asks for 195 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 195 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 67% — about 265 miles of range. Filling right to 100% instead takes 44 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Comfort Inn & Suites Sheboygan I-43

Where is Comfort Inn & Suites Sheboygan I-43?

Comfort Inn & Suites Sheboygan I-43 is at 3912 Motel Rd, Sheboygan, WI 53081, USA.

How fast can I charge at Comfort Inn & Suites Sheboygan I-43?

Comfort Inn & Suites Sheboygan I-43 lists a peak of 200 kW (DC fast) and CCS1 connectors.

How much does charging cost at Comfort Inn & Suites Sheboygan I-43?

Comfort Inn & Suites Sheboygan I-43 quotes $0.54 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Comfort Inn & Suites Sheboygan I-43 have?

Comfort Inn & Suites Sheboygan I-43 lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.