Charging stationChargePoint

Cuspo Office Building

30 Corporate Dr, Holtsville, NY 11742, USA

Power not listed charging across 2 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

EV charging at Cuspo Office Building
Power not listed2 charging stalls
ChargePoint

Charging location

Shortsville, New York

J1772

The record

The station at a glance

Cuspo Office Building is listed as a charging stop in Shortsville, New York, operated by ChargePoint. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
Power not listed
Stalls
2
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24 hours dailyFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Charging

Apollo Stones

Power not listed4 stalls

Patchogue, New York· 1.9 mi

J1772
$0.35 /kWhIndependent
Charging

Station Yards

Power not listed64 stalls

Ronkonkoma, New York· 3.6 mi

J1772
$0.32 /kWhEverCharge
EV charger at Greybarn MedfordLevel 2

Greybarn Medford

6.5 kW6 stalls

Milford, New York· 4.0 mi

J1772
Price not listedChargePoint

Brown's Ram Truck Center is 1.8 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Cuspo Office Building

Where is Cuspo Office Building?

Cuspo Office Building is at 30 Corporate Dr, Holtsville, NY 11742, USA.

How fast can I charge at Cuspo Office Building?

The record does not list a peak charging power for this station. It lists J1772 connectors.

How much does charging cost at Cuspo Office Building?

A per-kWh price is not listed for Cuspo Office Building. Some networks bill per minute or per session instead.

How many charging stalls does Cuspo Office Building have?

Cuspo Office Building lists 2 charging stalls. Its listed hours are 24 hours daily. Live availability is not tracked.