DC fastChargePoint24-hour access

Edmond Festival Market Place

34 W 2nd St, Edmond, OK 73003, USA

62.5 kW charging across 1 charging stalls, operated by ChargePoint. $0.35 per kWh listed.

EV charging at Edmond Festival Market Place
62.5 kW1 charging stalls
ChargePoint

Charging location

Edmond, Oklahoma

CCS1CHAdeMO

The record

The station at a glance

Edmond Festival Market Place is listed as dc fast charging in Edmond, Oklahoma, operated by ChargePoint. It records 1 charging stalls and CCS1, CHAdeMO connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
62.5 kW
Stalls
1
Connectors
2
Listed price
$0.35

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingStore

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Crest Foods EdmondCharging

Crest Foods Edmond

Power not listed4 stalls

Edmond, Oklahoma· 2.0 mi

CCS1CHAdeMO
$0.52 /kWhFrancis Energy
DC fast

Bob Howard Acura

62.5 kW3 stalls

Oklahoma City, Oklahoma· 3.6 mi

CCS1CHAdeMO+1
$0.51 /kWhChargePoint
EV charger at Joe Cooper Ford of EdmondCharging

Joe Cooper Ford of Edmond

Power not listed6 stalls

Oklahoma City, Oklahoma· 3.9 mi

CCS1CHAdeMO+1
$0.52 /kWhFrancis Energy
EV charger at Hilton Garden InnLevel 2

Hilton Garden Inn

6.5 kW2 stalls

Edmond, Oklahoma· 3.9 mi

J1772
Price not listedChargePoint

City of Edmond City Clerk's Office is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

62.5 kW peak here

51 min10% to 80%

The car asks for 63 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 63 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 28% — about 109 miles of range. Filling right to 100% instead takes 1 hr 13 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Edmond Festival Market Place

Where is Edmond Festival Market Place?

Edmond Festival Market Place is at 34 W 2nd St, Edmond, OK 73003, USA.

How fast can I charge at Edmond Festival Market Place?

Edmond Festival Market Place lists a peak of 62.5 kW (DC fast) and CCS1, CHAdeMO connectors.

How much does charging cost at Edmond Festival Market Place?

Edmond Festival Market Place quotes $0.35 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Edmond Festival Market Place have?

Edmond Festival Market Place lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.