Level 2Westminster Civic Center - Outer Lot
Westminster, California· 1.3 mi
8901 Garden Grove Blvd, Garden Grove, CA 92844, USA
200 kW charging across 4 charging stalls, operated by Flitway. A per-kWh price is not listed.
Charging location
Garden Grove, California
The record
Garden Grove Plaza is listed as dc fast charging in Garden Grove, California, operated by Flitway. It records 4 charging stalls and CCS1, CHAdeMO connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
Connectors
Power is the station’s peak, not a per-connector rating.
Access and setting
These details come from the station listing, not a live check.
Nearby
Westminster Civic Center - Outer Lot is 1.3 mi away.
Keep looking
Compatible vehicles
Exact connector matches for CCS1, CHAdeMO. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
200 kW peak here
The car asks for 195 kW here to begin with, then tapers to about 34 kW as the pack fills.
A 20-minute stop adds 67% — about 265 miles of range. Filling right to 100% instead takes 44 min.
Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.
Common questions
Garden Grove Plaza is at 8901 Garden Grove Blvd, Garden Grove, CA 92844, USA.
Garden Grove Plaza lists a peak of 200 kW (DC fast) and CCS1, CHAdeMO connectors.
A per-kWh price is not listed for Garden Grove Plaza. Some networks bill per minute or per session instead.
Garden Grove Plaza lists 4 charging stalls. It is listed as open around the clock. Live availability is not tracked.