DC fastChargePoint24-hour access

H-E-B (Closing September 28th)

1801 E 51st St, Austin, TX 78723, USA

130 kW charging across 4 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

EV charging at H-E-B (Closing September 28th)
130 kW4 charging stalls
ChargePoint

Charging location

Austin, Texas

CCS1CHAdeMO

The record

The station at a glance

H-E-B (Closing September 28th) is listed as dc fast charging in Austin, Texas, operated by ChargePoint. It records 4 charging stalls and CCS1, CHAdeMO connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
130 kW
Stalls
4
Connectors
2
Listed price
Not listed

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessPay parkingGas Station

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Mueller Film StudiosDC fast

Mueller Film Studios

100 kW2 stalls

Austin, Texas· <1 mi

CCS1CHAdeMO
Price not listedChargePoint
EV charger at Dell Children'sLevel 2

Dell Children's

6.5 kW25 stalls

Austin, Texas· <1 mi

J1772
$0.09 /kWhChargePoint
EV charger at M Station ApartmentsLevel 2

M Station Apartments

6.5 kW2 stalls

Austin, Texas· 1.4 mi

J1772Wall outlet
Price not listedChargePoint

Mueller Film Studios is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

125 kW peak here

28 min10% to 80%

The car asks for 125 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 125 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 55% — about 217 miles of range. Filling right to 100% instead takes 50 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at H-E-B (Closing September 28th)

Where is H-E-B (Closing September 28th)?

H-E-B (Closing September 28th) is at 1801 E 51st St, Austin, TX 78723, USA.

How fast can I charge at H-E-B (Closing September 28th)?

H-E-B (Closing September 28th) lists a peak of 130 kW (DC fast) and CCS1, CHAdeMO connectors.

How much does charging cost at H-E-B (Closing September 28th)?

A per-kWh price is not listed for H-E-B (Closing September 28th). Some networks bill per minute or per session instead.

How many charging stalls does H-E-B (Closing September 28th) have?

H-E-B (Closing September 28th) lists 4 charging stalls. It is listed as open around the clock. Live availability is not tracked.