Level 2AmpUp24-hour access

Jay Bird Farmhouse

843 Jay Bird Ln, Big Bear Lake, CA 92315, USA

11.5 kW charging across 2 charging stalls, operated by AmpUp. $0.60 per kWh listed.

EV charging at Jay Bird Farmhouse
11.5 kW2 charging stalls
AmpUp

Charging location

Big Bear Lake, California

J1772

The record

The station at a glance

Jay Bird Farmhouse is listed as level 2 charging in Big Bear Lake, California, operated by AmpUp. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
11.5 kW
Stalls
2
Connectors
1
Listed price
$0.60

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingLodging

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Charging

Pine Knot Guest Ranch

Power not listed2 outlets

Big Bear Lake, California· 1.0 mi

NEMA 14-50
Price not listedIndependent
Charging

Lakewood Cabins

Power not listed3 outlets

Big Bear Lake, California· 1.4 mi

NEMA 14-50
Price not listedIndependent
EV charger at Serrano CampgroundCharging

Serrano Campground

Power not listed2 outlets

Fawnskin, California· 2.0 mi

NEMA TT-30Wall outlet
Price not listedIndependent
EV charger at HomeStreet BankDC fast

HomeStreet Bank

75 kW2 stalls

Big Bear Lake, California· 2.7 mi

CCS1CHAdeMO
$0.45 /kWhLoop Global

The Village Shops and Courtyard is 1.0 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, even at this 12 kW post, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Jay Bird Farmhouse

Where is Jay Bird Farmhouse?

Jay Bird Farmhouse is at 843 Jay Bird Ln, Big Bear Lake, CA 92315, USA.

How fast can I charge at Jay Bird Farmhouse?

Jay Bird Farmhouse lists a peak of 11.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Jay Bird Farmhouse?

Jay Bird Farmhouse quotes $0.60 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Jay Bird Farmhouse have?

Jay Bird Farmhouse lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.