DC fastThe Village Shops and Courtyard
Big Bear Lake, California· 1.0 mi
843 Jay Bird Ln, Big Bear Lake, CA 92315, USA
11.5 kW charging across 2 charging stalls, operated by AmpUp. $0.60 per kWh listed.
Charging location
Big Bear Lake, California
The record
Jay Bird Farmhouse is listed as level 2 charging in Big Bear Lake, California, operated by AmpUp. It records 2 charging stalls and J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
Connectors
Power is the station’s peak, not a per-connector rating.
Access and setting
These details come from the station listing, not a live check.
Nearby
The Village Shops and Courtyard is 1.0 mi away.
Keep looking
Compatible vehicles
Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
Level 2 · AC only
Audi A6 e-tron takes about 11 kW on AC, even at this 12 kW post, so a full pack is a different kind of wait.
Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.
Common questions
Jay Bird Farmhouse is at 843 Jay Bird Ln, Big Bear Lake, CA 92315, USA.
Jay Bird Farmhouse lists a peak of 11.5 kW (Level 2) and J1772 connectors.
Jay Bird Farmhouse quotes $0.60 per kWh. Networks set their own tariffs, and some add a session or connection fee.
Jay Bird Farmhouse lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.