Level 2EV Connect24-hour access

JNC Management Co / Softball

P59W+8M Colonie, NY, USA

11.5 kW charging across 8 charging stalls, operated by EV Connect. $0.45 per kWh listed.

EV charging at JNC Management Co / Softball
11.5 kW8 charging stalls
EV Connect

Charging location

Colonie, New York

J1772

The record

The station at a glance

JNC Management Co / Softball is listed as level 2 charging in Colonie, New York, operated by EV Connect. It records 8 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
11.5 kW
Stalls
8
Connectors
1
Listed price
$0.45

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingShopping Center

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at TalbotsLevel 2

Talbots

9.6 kW6 stalls

Albany, New York· <1 mi

J1772
$0.45 /kWhEV Connect
EV charger at DeNooyer Chevrolet (1)Charging

DeNooyer Chevrolet (1)

Power not listed2 stalls

Albany, New York· <1 mi

J1772
Price not listedLivingston Energy
EV charger at Rosenblum CompaniesLevel 2

Rosenblum Companies

6.5 kW1 stall

Albany, New York· <1 mi

J1772
Price not listedChargePoint

Talbots is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, even at this 12 kW post, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at JNC Management Co / Softball

Where is JNC Management Co / Softball?

JNC Management Co / Softball is at P59W+8M Colonie, NY, USA.

How fast can I charge at JNC Management Co / Softball?

JNC Management Co / Softball lists a peak of 11.5 kW (Level 2) and J1772 connectors.

How much does charging cost at JNC Management Co / Softball?

JNC Management Co / Softball quotes $0.45 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does JNC Management Co / Softball have?

JNC Management Co / Softball lists 8 charging stalls. It is listed as open around the clock. Live availability is not tracked.