DC fastChargePoint24-hour access

Las Palmas Public Park And Dog Park

1810 E 22nd St, National City, CA 91950, USA

62.5 kW charging across 6 charging stalls, operated by ChargePoint. $0.27 per kWh listed.

EV charging at Las Palmas Public Park And Dog Park
62.5 kW6 charging stalls
ChargePoint

Charging location

National City, California

CCS1CHAdeMOJ1772

The record

The station at a glance

Las Palmas Public Park And Dog Park is listed as dc fast charging in National City, California, operated by ChargePoint. It records 6 charging stalls and CCS1, CHAdeMO, J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
62.5 kW
Stalls
6
Connectors
3
Listed price
$0.27

Connectors

Plug options

3 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingRecreation

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Pepper ParkLevel 2

Pepper Park

6.5 kW6 stalls

National City, California· 2.0 mi

J1772
$0.28 /kWhChargePoint
EV charger at Coronado CaysLevel 2

Coronado Cays

7.7 kW4 stalls

Coronado, California· 4.0 mi

J1772
Price not listedOpConnect

805/54 Freeway Park & Ride is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO, J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

62.5 kW peak here

51 min10% to 80%

The car asks for 63 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 63 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 28% — about 109 miles of range. Filling right to 100% instead takes 1 hr 13 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Las Palmas Public Park And Dog Park

Where is Las Palmas Public Park And Dog Park?

Las Palmas Public Park And Dog Park is at 1810 E 22nd St, National City, CA 91950, USA.

How fast can I charge at Las Palmas Public Park And Dog Park?

Las Palmas Public Park And Dog Park lists a peak of 62.5 kW (DC fast) and CCS1, CHAdeMO, J1772 connectors.

How much does charging cost at Las Palmas Public Park And Dog Park?

Las Palmas Public Park And Dog Park quotes $0.27 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Las Palmas Public Park And Dog Park have?

Las Palmas Public Park And Dog Park lists 6 charging stalls. It is listed as open around the clock. Live availability is not tracked.