DC fastEV Connect

Lester Glenn Buick-GMC

230 NJ-37, Toms River, NJ 08753, USA

50 kW charging across 1 charging stalls, operated by EV Connect. A per-kWh price is not listed.

EV charging at Lester Glenn Buick-GMC
50 kW1 charging stalls
EV Connect

Charging location

Toms River, New Jersey

CCS1

The record

The station at a glance

Lester Glenn Buick-GMC is listed as dc fast charging in Toms River, New Jersey, operated by EV Connect. It records 1 charging stalls and CCS1 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
50 kW
Stalls
1
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicFree parkingDealership

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Charging

Pine Belt Nissan

Power not listed3 stalls

Toms River, New Jersey· <1 mi

CCS1CHAdeMO+1
Price not listedInCharge
Charging

KWEV Charging

Power not listed8 stalls

Toms River, New Jersey· 5.3 mi

J1772
Price not listedKWEV
Charging

KWEV Charging 360 Oak

Power not listed8 stalls

Lakewood, New Jersey· 7.1 mi

J1772
Price not listedKWEV
EV charger at 500 BOTACharging

500 BOTA

Power not listed28 stalls

Lakewood, New Jersey· 7.6 mi

J1772NACS
$0.45 /kWhIndependent

Pine Belt Nissan is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

50 kW peak here

1 hr 4 min10% to 80%

The car asks for 50 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 50 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 22% — about 87 miles of range. Filling right to 100% instead takes 1 hr 27 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Lester Glenn Buick-GMC

Where is Lester Glenn Buick-GMC?

Lester Glenn Buick-GMC is at 230 NJ-37, Toms River, NJ 08753, USA.

How fast can I charge at Lester Glenn Buick-GMC?

Lester Glenn Buick-GMC lists a peak of 50 kW (DC fast) and CCS1 connectors.

How much does charging cost at Lester Glenn Buick-GMC?

A per-kWh price is not listed for Lester Glenn Buick-GMC. Some networks bill per minute or per session instead.

How many charging stalls does Lester Glenn Buick-GMC have?

Lester Glenn Buick-GMC lists 1 charging stalls. Live availability is not tracked.