Level 2ChargePoint24-hour access

Northstar Bank

3020 Lohr Rd, Ann Arbor, MI 48108, USA

6.5 kW charging across 1 charging stalls, operated by ChargePoint. $0.35 per kWh listed.

EV charging at Northstar Bank
6.5 kW1 charging stalls
ChargePoint

Charging location

Ann Arbor, Michigan

J1772

The record

The station at a glance

Northstar Bank is listed as level 2 charging in Ann Arbor, Michigan, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
1
Connectors
1
Listed price
$0.35

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingBank

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at MAVDCharging

MAVD

Power not listed2 stalls

Ann Arbor, Michigan· 1.4 mi

J1772
Price not listedIndependent
EV charger at Packard RowCharging

Packard Row

Power not listed10 stalls

Ann Arbor, Michigan· 2.2 mi

J1772
$0.35 /kWhIndependent
EV charger at The GeorgeCharging

The George

Power not listed1 stall

Ann Arbor, Michigan· 2.2 mi

J1772
Price not listedChargePoint

Culver’s Ann Arbor is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Northstar Bank

Where is Northstar Bank?

Northstar Bank is at 3020 Lohr Rd, Ann Arbor, MI 48108, USA.

How fast can I charge at Northstar Bank?

Northstar Bank lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Northstar Bank?

Northstar Bank quotes $0.35 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Northstar Bank have?

Northstar Bank lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.