Level 2SynergEV24-hour access

NYSUT 800 Troy-Schenectady Rd

800 Troy-Schenectady Rd, Latham, NY 12110, USA

11 kW charging across 14 charging stalls, operated by SynergEV. A per-kWh price is not listed.

11 kW14 charging stalls
SynergEV

Charging location

Latham, New York

J1772

The record

The station at a glance

NYSUT 800 Troy-Schenectady Rd is listed as level 2 charging in Latham, New York, operated by SynergEV. It records 14 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
11 kW
Stalls
14
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Lear Jet LaneCharging

Lear Jet Lane

Power not listed2 stalls

Latham, New York· <1 mi

J1772
$0.35 /kWhIndependent
EV charger at Cor Center LathamLevel 2

Cor Center Latham

6.7 kW20 stalls

Latham, New York· <1 mi

J1772
Price not listedViaLynk

Sunrise Solars Apartments is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at NYSUT 800 Troy-Schenectady Rd

Where is NYSUT 800 Troy-Schenectady Rd?

NYSUT 800 Troy-Schenectady Rd is at 800 Troy-Schenectady Rd, Latham, NY 12110, USA.

How fast can I charge at NYSUT 800 Troy-Schenectady Rd?

NYSUT 800 Troy-Schenectady Rd lists a peak of 11 kW (Level 2) and J1772 connectors.

How much does charging cost at NYSUT 800 Troy-Schenectady Rd?

A per-kWh price is not listed for NYSUT 800 Troy-Schenectady Rd. Some networks bill per minute or per session instead.

How many charging stalls does NYSUT 800 Troy-Schenectady Rd have?

NYSUT 800 Troy-Schenectady Rd lists 14 charging stalls. It is listed as open around the clock. Live availability is not tracked.