Charging station24-hour access

Poweral - Aberdeen Matawan Station - Lot 3

43 Atlantic Ave, Aberdeen Township, NJ 07747, USA

Power not listed charging across 12 charging stalls. A per-kWh price is not listed.

Power not listed12 charging stalls
Independent

Charging location

Aberdeen Township, New Jersey

J1772NACS

The record

The station at a glance

Poweral - Aberdeen Matawan Station - Lot 3 is listed as a charging stop in Aberdeen Township, New Jersey. It records 12 charging stalls and J1772, NACS connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
Power not listed
Stalls
12
Connectors
2
Listed price
Not listed

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour access

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Cinemark 12 HazletCharging

Cinemark 12 Hazlet

Power not listed2 stalls

Hazlet, New Jersey· 2.8 mi

J1772
$0.32 /kWhJOLT

558 Lloyd Rd Parking Lot is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772, NACS. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Poweral - Aberdeen Matawan Station - Lot 3

Where is Poweral - Aberdeen Matawan Station - Lot 3?

Poweral - Aberdeen Matawan Station - Lot 3 is at 43 Atlantic Ave, Aberdeen Township, NJ 07747, USA.

How fast can I charge at Poweral - Aberdeen Matawan Station - Lot 3?

The record does not list a peak charging power for this station. It lists J1772, NACS connectors.

How much does charging cost at Poweral - Aberdeen Matawan Station - Lot 3?

A per-kWh price is not listed for Poweral - Aberdeen Matawan Station - Lot 3. Some networks bill per minute or per session instead.

How many charging stalls does Poweral - Aberdeen Matawan Station - Lot 3 have?

Poweral - Aberdeen Matawan Station - Lot 3 lists 12 charging stalls. It is listed as open around the clock. Live availability is not tracked.