DC fastChargePoint24-hour access

Principal Manufacturing Corporation

2800 W 19th St, Broadview, IL 60155, USA

62.5 kW charging across 2 charging stalls, operated by ChargePoint. $0.35 per kWh listed.

EV charging at Principal Manufacturing Corporation
62.5 kW2 charging stalls
ChargePoint

Charging location

Broadview, Illinois

CCS1NACS

The record

The station at a glance

Principal Manufacturing Corporation is listed as dc fast charging in Broadview, Illinois, operated by ChargePoint. It records 2 charging stalls and CCS1, NACS connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
62.5 kW
Stalls
2
Connectors
2
Listed price
$0.35

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at The Emerson ApartmentsCharging

The Emerson Apartments

Power not listed4 stalls

Oak Park, Illinois· 3.6 mi

J1772NACS
$0.30 /kWhIndependent
EV charger at Rush Oak BrookLevel 2

Rush Oak Brook

6.5 kW2 stalls

Oak Brook, Illinois· 3.7 mi

J1772
Price not listedChargePoint
EV charger at GFCS LLC Melrose ParkCharging

GFCS LLC Melrose Park

Power not listed9 stalls

Melrose Park, Illinois· 3.8 mi

CCS1
$0.45 /kWhInCharge

Riverside-Brookfield High School is 2.0 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, NACS. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

62.5 kW peak here

51 min10% to 80%

The car asks for 63 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 63 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 28% — about 109 miles of range. Filling right to 100% instead takes 1 hr 13 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Principal Manufacturing Corporation

Where is Principal Manufacturing Corporation?

Principal Manufacturing Corporation is at 2800 W 19th St, Broadview, IL 60155, USA.

How fast can I charge at Principal Manufacturing Corporation?

Principal Manufacturing Corporation lists a peak of 62.5 kW (DC fast) and CCS1, NACS connectors.

How much does charging cost at Principal Manufacturing Corporation?

Principal Manufacturing Corporation quotes $0.35 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Principal Manufacturing Corporation have?

Principal Manufacturing Corporation lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.