DC fastEV Connect

Queens Borough Hall Municipal Parking Lot

80-25 126th St, Kew Gardens, NY 11415, USA

75.1 kW charging across 34 charging stalls, operated by EV Connect. A per-kWh price is not listed.

75.1 kW34 charging stalls
EV Connect

Charging location

New York, New York

CCS1CHAdeMOJ1772

The record

The station at a glance

Queens Borough Hall Municipal Parking Lot is listed as dc fast charging in New York, New York, operated by EV Connect. It records 34 charging stalls and CCS1, CHAdeMO, J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
75.1 kW
Stalls
34
Connectors
3
Listed price
Not listed

Connectors

Plug options

3 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicEnter by 6am-9am, Exit by 7pmPay parkingParking Garage/Lot

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Charging

Parker Towers 40

Power not listed16 stalls

New York, New York· 1.4 mi

J1772
$1.00 /kWhEVoke
Charging

Parker Towers 20

Power not listed2 stalls

New York, New York· 1.4 mi

J1772
$1.00 /kWhEVoke
Charging

Tangram Mall

Power not listed4 stalls

New York, New York· 3.2 mi

NACS
Price not listedIndependent

Parker Towers 40 is 1.4 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO, J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

75.075 kW peak here

43 min10% to 80%

The car asks for 75 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 75 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 33% — about 131 miles of range. Filling right to 100% instead takes 1 hr 5 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Queens Borough Hall Municipal Parking Lot

Where is Queens Borough Hall Municipal Parking Lot?

Queens Borough Hall Municipal Parking Lot is at 80-25 126th St, Kew Gardens, NY 11415, USA.

How fast can I charge at Queens Borough Hall Municipal Parking Lot?

Queens Borough Hall Municipal Parking Lot lists a peak of 75.1 kW (DC fast) and CCS1, CHAdeMO, J1772 connectors.

How much does charging cost at Queens Borough Hall Municipal Parking Lot?

A per-kWh price is not listed for Queens Borough Hall Municipal Parking Lot. Some networks bill per minute or per session instead.

How many charging stalls does Queens Borough Hall Municipal Parking Lot have?

Queens Borough Hall Municipal Parking Lot lists 34 charging stalls. Its listed hours are Enter by 6am-9am, Exit by 7pm. Live availability is not tracked.