DC fastMonta24-hour access

Reed City Ace Hardware

838 S Chestnut St, Reed City, MI 49677, USA

200 kW charging across 2 charging stalls, operated by Monta. $0.50 per kWh listed.

200 kW2 charging stalls
Monta

Charging location

Reed City, Michigan

CCS1NACS

The record

The station at a glance

Reed City Ace Hardware is listed as dc fast charging in Reed City, Michigan, operated by Monta. It records 2 charging stalls and CCS1, NACS connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
200 kW
Stalls
2
Connectors
2
Listed price
$0.50

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingStore

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Jimmy John'sDC fast

Jimmy John's

130 kW2 stalls

Big Rapids, Michigan· 12 mi

CCS1CHAdeMO
$0.40 /kWhChargePoint

Great Lakes Energy Co-Op Reed City is 1.6 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, NACS. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

200 kW peak here

22 min10% to 80%

The car asks for 195 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 195 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 67% — about 265 miles of range. Filling right to 100% instead takes 44 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Reed City Ace Hardware

Where is Reed City Ace Hardware?

Reed City Ace Hardware is at 838 S Chestnut St, Reed City, MI 49677, USA.

How fast can I charge at Reed City Ace Hardware?

Reed City Ace Hardware lists a peak of 200 kW (DC fast) and CCS1, NACS connectors.

How much does charging cost at Reed City Ace Hardware?

Reed City Ace Hardware quotes $0.50 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Reed City Ace Hardware have?

Reed City Ace Hardware lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.