Level 2Moreno Valley Electrical Utility - West
Moreno Valley, California· <1 mi
14290 Frederick St, Moreno Valley, CA 92553, USA
6.6 kW charging across 3 charging stalls, operated by ChargePoint. $0.33 per kWh listed.
Charging location
Moreno Valley, California
The record
Riverside County Department of Waste is listed as level 2 charging in Moreno Valley, California, operated by ChargePoint. It records 3 charging stalls and CCS1, CHAdeMO, J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
Connectors
CCS1
Listed at this station · what it fits
CHAdeMO
Listed at this station · what it fits
J1772
Listed at this station · what it fits
Power is the station’s peak, not a per-connector rating.
Access and setting
These details come from the station listing, not a live check.
Nearby
Moreno Valley Electrical Utility - West is <1 mi away.
Keep looking
Compatible vehicles
Exact connector matches for CCS1, CHAdeMO, J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
Level 2 · AC only
Audi A6 e-tron takes about 6.6 kW on AC, so a full pack is a different kind of wait.
Estimate from 75.8 kWh at 6.6 kW, including the tail a pack spends balancing at the end.
Common questions
Riverside County Department of Waste is at 14290 Frederick St, Moreno Valley, CA 92553, USA.
Riverside County Department of Waste lists a peak of 6.6 kW (Level 2) and CCS1, CHAdeMO, J1772 connectors.
Riverside County Department of Waste quotes $0.33 per kWh. Networks set their own tariffs, and some add a session or connection fee.
Riverside County Department of Waste lists 3 charging stalls. It is listed as open around the clock. Live availability is not tracked.