Level 2ChargePoint

S Capital of Texas Hwy Building

900 S Capital of Texas Hwy, West Lake Hills, TX 78746, USA

6.5 kW charging across 1 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

6.5 kW1 charging stalls
ChargePoint

Charging location

West Lake Hills, Texas

J1772

The record

The station at a glance

S Capital of Texas Hwy Building is listed as level 2 charging in West Lake Hills, Texas, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
1
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicFree parkingParking Garage/Lot

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Charging

Brandywine Austin

Power not listed1 stall

Austin, Texas· <1 mi

J1772Wall outlet
Price not listedChargePoint
EV charger at KKMJ - GarageLevel 2

KKMJ - Garage

6.5 kW1 stall

Austin, Texas· 1.1 mi

J1772
Price not listedChargePoint

Village At Westlake - H-E-B is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at S Capital of Texas Hwy Building

Where is S Capital of Texas Hwy Building?

S Capital of Texas Hwy Building is at 900 S Capital of Texas Hwy, West Lake Hills, TX 78746, USA.

How fast can I charge at S Capital of Texas Hwy Building?

S Capital of Texas Hwy Building lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at S Capital of Texas Hwy Building?

A per-kWh price is not listed for S Capital of Texas Hwy Building. Some networks bill per minute or per session instead.

How many charging stalls does S Capital of Texas Hwy Building have?

S Capital of Texas Hwy Building lists 1 charging stalls. Live availability is not tracked.