Springfield Building Division
70 Tapley St, Springfield, MA 01104, USA
6.5 kW charging across 1 charging stalls, operated by ChargePoint. $0.90 per kWh listed.
Charging location
Springfield, Massachusetts
The record
The station at a glance
Springfield Building Division is listed as level 2 charging in Springfield, Massachusetts, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
- Peak power
- 6.5 kW
- Stalls
- 1
- Connectors
- 1
- Listed price
- $0.90
Connectors
Plug options
Power is the station’s peak, not a per-connector rating.
Access and setting
What surrounds the charger
These details come from the station listing, not a live check.
Nearby
Other charging stops
275a Albany St Parking Lot is <1 mi away.
Keep looking
This stop in context
Compatible vehicles
Cars that can charge here
Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
How long would your car sit here?
Level 2 · AC only
Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.
Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.
Common questions
Charging at Springfield Building Division
Where is Springfield Building Division?
Springfield Building Division is at 70 Tapley St, Springfield, MA 01104, USA.
How fast can I charge at Springfield Building Division?
Springfield Building Division lists a peak of 6.5 kW (Level 2) and J1772 connectors.
How much does charging cost at Springfield Building Division?
Springfield Building Division quotes $0.90 per kWh. Networks set their own tariffs, and some add a session or connection fee.
How many charging stalls does Springfield Building Division have?
Springfield Building Division lists 1 charging stalls. Live availability is not tracked.


