Level 2BGSU College of Business, Maurer Center
Bowling Green, Ohio· 1.7 mi
1225 N Main St, Bowling Green, OH 43402, USA
50 kW charging across 1 charging stalls, operated by InCharge. $0.45 per kWh listed.
Charging location
Bowling Green, Ohio
The record
Thayer Chevrolet is listed as dc fast charging in Bowling Green, Ohio, operated by InCharge. It records 1 charging stalls and CCS1 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
Connectors
Power is the station’s peak, not a per-connector rating.
Access and setting
These details come from the station listing, not a live check.
Nearby
BGSU College of Business, Maurer Center is 1.7 mi away.
Keep looking
Compatible vehicles
Exact connector matches for CCS1. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
50 kW peak here
The car asks for 50 kW here to begin with, then tapers to about 34 kW as the pack fills.
A 20-minute stop adds 22% — about 87 miles of range. Filling right to 100% instead takes 1 hr 27 min.
Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.
Common questions
Thayer Chevrolet is at 1225 N Main St, Bowling Green, OH 43402, USA.
Thayer Chevrolet lists a peak of 50 kW (DC fast) and CCS1 connectors.
Thayer Chevrolet quotes $0.45 per kWh. Networks set their own tariffs, and some add a session or connection fee.
Thayer Chevrolet lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.