Level 2ChargePoint

Ulster County Dept of Public Works

300-398 Shamrock Lane, Kingston, NY 12401, USA

6.5 kW charging across 1 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

EV charging at Ulster County Dept of Public Works
6.5 kW1 charging stalls
ChargePoint

Charging location

Kingston, New York

J1772

The record

The station at a glance

Ulster County Dept of Public Works is listed as level 2 charging in Kingston, New York, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
1
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24 hrs.Free parkingGovernment

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Forsyth ParkLevel 2

Forsyth Park

6.5 kW2 stalls

Kingston, New York· <1 mi

J1772
Price not listedChargePoint
EV charger at Municipal ParkingLevel 2

Municipal Parking

6.5 kW1 stall

Kingston, New York· 1.4 mi

J1772
Price not listedChargePoint

Forsyth Park is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Ulster County Dept of Public Works

Where is Ulster County Dept of Public Works?

Ulster County Dept of Public Works is at 300-398 Shamrock Lane, Kingston, NY 12401, USA.

How fast can I charge at Ulster County Dept of Public Works?

Ulster County Dept of Public Works lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Ulster County Dept of Public Works?

A per-kWh price is not listed for Ulster County Dept of Public Works. Some networks bill per minute or per session instead.

How many charging stalls does Ulster County Dept of Public Works have?

Ulster County Dept of Public Works lists 1 charging stalls. Its listed hours are 24 hrs.. Live availability is not tracked.