Level 2ChargePoint24-hour access

Verdant - 107 S Del Rosa

Del Rosa @ Rialto Sb Fs, San Bernardino, CA 92408, USA

6.5 kW charging across 1 charging stalls, operated by ChargePoint. $0.32 per kWh listed.

6.5 kW1 charging stalls
ChargePoint

Charging location

San Bernardino, California

J1772

The record

The station at a glance

Verdant - 107 S Del Rosa is listed as level 2 charging in San Bernardino, California, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
1
Connectors
1
Listed price
$0.32

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingParking Garage/Lot

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Luxivair SBDLevel 2

Luxivair SBD

6.5 kW12 stalls

San Bernardino, California· <1 mi

J1772
$0.32 /kWhChargePoint
EV charger at EDD Tax DivisionLevel 2

EDD Tax Division

6.5 kW6 stalls

San Bernardino, California· 2.2 mi

J1772
$0.35 /kWhChargePoint
EV charger at Home2 Suites by HiltonCharging

Home2 Suites by Hilton

Power not listed6 stalls

San Bernardino, California· 2.3 mi

J1772
$1.00 /kWhIndependent

Norton Air Force Base Museum is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Verdant - 107 S Del Rosa

Where is Verdant - 107 S Del Rosa?

Verdant - 107 S Del Rosa is at Del Rosa @ Rialto Sb Fs, San Bernardino, CA 92408, USA.

How fast can I charge at Verdant - 107 S Del Rosa?

Verdant - 107 S Del Rosa lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Verdant - 107 S Del Rosa?

Verdant - 107 S Del Rosa quotes $0.32 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Verdant - 107 S Del Rosa have?

Verdant - 107 S Del Rosa lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.