DC fastChargePoint24-hour access

Windemuller Electric

1190 Electric Ave, Wayland, MI 49348, USA

130 kW charging across 2 charging stalls, operated by ChargePoint. $0.30 per kWh listed.

130 kW2 charging stalls
ChargePoint

Charging location

Wayland, Michigan

CCS1CHAdeMO

The record

The station at a glance

Windemuller Electric is listed as dc fast charging in Wayland, Michigan, operated by ChargePoint. It records 2 charging stalls and CCS1, CHAdeMO connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
130 kW
Stalls
2
Connectors
2
Listed price
$0.30

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at ExxonDC fast

Exxon

200 kW4 stalls

Wayland, Michigan· 3.0 mi

CCS1NACS
$0.49 /kWhMonta
EV charger at Bloomfield TownhomesCharging

Bloomfield Townhomes

Power not listed2 stalls

Grand Rapids, Michigan· 6.4 mi

NACS
$0.25 /kWhIndependent
EV charger at Premier GraphicsChargingClosed

Premier Graphics

Power not listed4 stalls

Grand Rapids, Michigan· 6.7 mi

J1772
$0.25 /kWhIndependent

Exxon is 3.0 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

125 kW peak here

28 min10% to 80%

The car asks for 125 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 125 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 55% — about 217 miles of range. Filling right to 100% instead takes 50 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Windemuller Electric

Where is Windemuller Electric?

Windemuller Electric is at 1190 Electric Ave, Wayland, MI 49348, USA.

How fast can I charge at Windemuller Electric?

Windemuller Electric lists a peak of 130 kW (DC fast) and CCS1, CHAdeMO connectors.

How much does charging cost at Windemuller Electric?

Windemuller Electric quotes $0.30 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Windemuller Electric have?

Windemuller Electric lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.