WoodSpring Suites Moreno Valley
Moreno Valley, California· 2.8 mi
27100 Eucalyptus Ave, Moreno Valley, CA 92555, USA
9.6 kW charging across 2 charging stalls, operated by JOLT. $1.00 per kWh listed.
Charging location
Moreno Valley, California
The record
Kohl's Moreno Valley is listed as level 2 charging in Moreno Valley, California, operated by JOLT. It records 2 charging stalls and J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
Connectors
Power is the station’s peak, not a per-connector rating.
Access and setting
These details come from the station listing, not a live check.
Nearby
WoodSpring Suites Moreno Valley is 2.8 mi away.
Keep looking
Compatible vehicles
Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
Level 2 · AC only
Audi A6 e-tron takes about 9.6 kW on AC, so a full pack is a different kind of wait.
Estimate from 75.8 kWh at 9.6 kW, including the tail a pack spends balancing at the end.
Common questions
Kohl's Moreno Valley is at 27100 Eucalyptus Ave, Moreno Valley, CA 92555, USA.
Kohl's Moreno Valley lists a peak of 9.6 kW (Level 2) and J1772 connectors.
Kohl's Moreno Valley quotes $1.00 per kWh. Networks set their own tariffs, and some add a session or connection fee.
Kohl's Moreno Valley lists 2 charging stalls. Its listed hours are 08:00 AM - 10:00 PM. Live availability is not tracked.