Level 2ChargePoint

Old Bridge Township, Department of Public Works

1 Old Bridge Plaza, Old Bridge, NJ 08857, USA

6.5 kW charging across 2 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

EV charging at Old Bridge Township, Department of Public Works
6.5 kW2 charging stalls
ChargePoint

Charging location

Old Bridge, New Jersey

J1772

The record

The station at a glance

Old Bridge Township, Department of Public Works is listed as level 2 charging in Old Bridge, New Jersey, operated by ChargePoint. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
2
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicFree parkingGovernment

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at 99 BridgeLevel 2

99 Bridge

6.5 kW2 stalls

Old Bridge, New Jersey· 1.7 mi

J1772
Price not listedChargePoint
EV charger at DCH Academy HondaDC fast

DCH Academy Honda

200 kW1 stall

Old Bridge, New Jersey· 3.1 mi

CCS1
$0.65 /kWhChargePoint

99 Bridge is 1.7 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Old Bridge Township, Department of Public Works

Where is Old Bridge Township, Department of Public Works?

Old Bridge Township, Department of Public Works is at 1 Old Bridge Plaza, Old Bridge, NJ 08857, USA.

How fast can I charge at Old Bridge Township, Department of Public Works?

Old Bridge Township, Department of Public Works lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Old Bridge Township, Department of Public Works?

A per-kWh price is not listed for Old Bridge Township, Department of Public Works. Some networks bill per minute or per session instead.

How many charging stalls does Old Bridge Township, Department of Public Works have?

Old Bridge Township, Department of Public Works lists 2 charging stalls. Live availability is not tracked.