Level 2ChargePoint24-hour access

Revitalize Community Development Corporation - Front

240 Cadwell Dr, Springfield, MA 01104, USA

7.7 kW charging across 2 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

7.7 kW2 charging stalls
ChargePoint

Charging location

Springfield, Massachusetts

J1772

The record

The station at a glance

Revitalize Community Development Corporation - Front is listed as level 2 charging in Springfield, Massachusetts, operated by ChargePoint. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
7.7 kW
Stalls
2
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Pride 631DC fast

Pride 631

80 kW2 stalls

Chicopee, Massachusetts· <1 mi

CCS1CHAdeMO
$0.52 /kWhChargePoint
DC fast

Best Pizza

120 kW3 stalls

Springfield, Massachusetts· 2.2 mi

CCS1NACS
$0.50 /kWhRed E
Level 2

STEM Middle Academy

6.5 kW1 stall

Springfield, Massachusetts· 2.4 mi

J1772
$0.39 /kWhChargePoint
EV charger at CSW, Inc.Level 2

CSW, Inc.

6.5 kW2 stalls

Ludlow, Massachusetts· 3.1 mi

J1772
$0.35 /kWhChargePoint

Pride 631 is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

8 hr 7 min10% to 80%

Audi A6 e-tron takes about 7.68 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 7.68 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Revitalize Community Development Corporation - Front

Where is Revitalize Community Development Corporation - Front?

Revitalize Community Development Corporation - Front is at 240 Cadwell Dr, Springfield, MA 01104, USA.

How fast can I charge at Revitalize Community Development Corporation - Front?

Revitalize Community Development Corporation - Front lists a peak of 7.7 kW (Level 2) and J1772 connectors.

How much does charging cost at Revitalize Community Development Corporation - Front?

A per-kWh price is not listed for Revitalize Community Development Corporation - Front. Some networks bill per minute or per session instead.

How many charging stalls does Revitalize Community Development Corporation - Front have?

Revitalize Community Development Corporation - Front lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.